ovada

Ovada equipped installed area

  • Type of Intervention: equipped installed area
  • Place: Ovada (AL)
  • Way of Intervention:
    Put into practice of the intervention through deed of partnership with Finpiemonte Partecipazione S.p.A. – Codelfa S.p.A. – SAIA S.p.A. – Energia e Territorio S.p.A.
  • Property: SIT S.r.l.
  • State of Progress: Available in the market
  • Infrastructures: A26 Genova/Gravellona Toce – A21 Torino/Piacenza – A10 Genova/Ventimiglia – Genova’s Harbour: 53 km – Genova’s Airport: 49 km
  • End Use: Productive
  • Allowed Settlements: Area designed for craft activities – productive, productive services.
  • Intervention Setting: The intervention – which consists in the realization of an equipped industrial area with the addition of works of urbanization and infrastructures – is located within the Comune di Ovanda (Ovada Municipality – area “P.I.P. of strada Rebba”). The areas are delimited from north by the Genova- Asti railway, from east by mainly farming areas and from south by a previously settled area designed for production and from west by Strada Rebba.
  • Quantitative Data: Available land surface: 64.838 m2 Building Index: 0,5
  • Contacts: Arch. Cristiano Susta Phone. 011.7172331 Fax. 011.7730349